Chloride Project

  1. Home
  2. Chloride Project
SanPedro Scenery

SUMMARY OF WORK

The Cooper Shaft Backfill project was completed was completed over a two-day period (March 19th – March 20th, 2025) and consisted of backfilling a shaft located immediately adjacent to a county road and in the front yard of the property owner. Approximately 150 cubic yards of fill and 72 yards of topsoil were used to fill the feature and regrade the surface in preparation as a seed bed for revegetation. Seeding and mulching of the disturbed area was completed after recontouring occurred on March 20th, 2025. Overall, the project was successful, and the landowner was extremely pleased with our efforts safeguarding the hazard that was associated with the abandoned mine located on his property.

 Demobilization shall be conducted in such a manner to ensure that the Contractor leaves all project areas in as good or better condition than before disturbance.

 

NEPA Public Meetings/Notices
Notice Type Date & Time Type of Meeting Attendance List
Categorical Exclusion 09/21/2024 Newspaper, EMNRD website, 9/21/2024
Specifications, Maps and Images
Specifications
Project Manual:  Used task order_06111-03 that is attached, this document contains the specs. No manual was created for this project.
Figures
All Figures
Images of the Project
Administrative and Technical Questions and/or Comments
Administrative: Matthew Peralta @ 505.819.1955 or email matthew.peralta@emnrd.nm.gov
Technical: Matthew Peralta @ 505.819.1955 or email  matthew.peralta@emnrd.nm.gov
Completion of Contract
Year Completed:  2025
Cost: $ 7,497.01
Project Engineer:
  Meghan McDonald
Project Manager:  Matthew Peralta