GR010RE Tyrone Mine
GR010RE Tyrone Mine – Regular Existing
GR010RE Tyrone Mine
Freeport-McMoRan Tyrone Inc., Tyrone, New Mexico
Copper, Grant County
10-2014 Approved Modification 14-1
10-2014 Third Party Guarantee for Modification 14-1
08-2014 FMI Response to Comments
08-2014 MMD Additional Comments on the Tyrone Mine Proposed 9AX stockpile, Modification 14-1
08-2014 Hopi Tribe Request for Information Letter on the Tyrone Mine Proposed 9AX stockpile, Modification 14-1
07-2014 Tribal Consultation Request Letter, Tyrone Mine Proposed 9AX stockpile, Modification 14-1
07-2014 FMI Response to MMD Comments on Modification 14-1
06-2014 MMD Comments on Modification 14-1 Application
06-2014 Revised Figures and Tables, Modification 14-1
04-2014 Modification 14-1 to 9AX stockpile
04-2014 Permit Revision 01-01
12-2013 MMD letter granting Public Hearing
12-2013 Application for Financial Assurance Release, Modification 12-3
03-2013 MMD Letter Regarding Modification 12-3
02-2013 Replacement Page, Appendix E to Modification 12-3
02-2013 GRIP Letter, Modification 12-3
12-2012 Financial Assurance Release Application, Modification 12-3 (20MB)
02-2012 Request for Modification Regarding Upward Migration Study
03-2012 Additional Information from FMI, Revision 10-1
01-2012 NMED Determination for Revision 10-1
08-2011 Public Comments on Revision 10-1
03-2011 Permit Revision 10-1, Response to Agency Comments
Freeport-McMoRan Response to Agency Comments
Figure B3: Storage Space Section
Figure B4: Lost Space Section
Figure 4: Illustrative Section Locations
Figure 5: Illustrative Cross Section
Figure 6: Water Management Drawing
Fall 2010
Permit Revision 10-1, Agency Review and Comment Letters
The Hopi Tribe
Gila Resources Information Project
New Mexico Department of Cultural Affairs
New Mexico Department of Game and Fish
New Mexico Office of the State Engineer
09-2010
Permit Revision 10-1, Request for Agency Review and Comment
08-2010 Permit Modification 10-1 Administratively Incomplete Letter
07-2010
Permit Revision 10-1
Cost Estimate, Interior Slopes
Cost Estimate, Pit Backfilling
07-2010
Permit Revision 10-1, Modification of Permit Waiver
Cover Letter
Waiver Modification Application
Figure 1: Existing & Proposed Waiver Areas
Figure 2: Extended Pit Waiver Areas
Figure 3: Proposed Interior Slope Waiver Areas
Attachment A: Stockpile Interior Area Cost Estimate
Attachment B: Mine Life / Economics Information
Attachment C: Pit Waiver Area Cost Estimate
Application Fee and Public Notice
12-2009 Permit Modification 09-03, Partial Release of Financial Assurance
12-2008 Permit Modification 08-01
Application
Attachment A: 2007 Approved Financial Assurance & NPV Calculation
Attachment B: Financial Assurance Current Dollar Reduction Cost Estimate
Table 1
Tables 2 & 3
Attachment C: Proposed Modifications to Financial Assurance Cash Flow & NPV Calculation
Attachment D: Present Day (2003) Financial Assurance Cost Estimate for the No. 1 Tailing Reclamation Project
Attachment E: Present Day (2003) Financial Assurance Cost Estimate for the No. 1A Tailing Reclamation
Project
Attachment F: Present Day (2003) Financial Assurance Cost Estimate for the No. 1X Tailing Reclamation
Project
Attachment G: Present Day (2003) Financial Assurance Cost Estimate for the No. 2 Tailing Reclamation Project
Attachment H: Public Notice Documentation
Attachment I: Electronic Files