MK006RE St. Anthony Mine, Closeout Plan
MK006RE St. Anthony Mine
United Nuclear Corporation, Gallup, New Mexico
Uranium, McKinley County
2026-09 Request for Written Environmental Determination
2026-09 Technical Complete Letter
2026-07 UNC Response to Agency Comments
2026-03 Combined Agency Comments on 90% CCOP
2025-10 3rd Round Agency Request for Comment
2025-09 90% CCOP Main Document
2025-09 90% CCOP Drawings
2025-09 90% CCOP Appendices
2025-02 Technically Complete Letter with Comments
2024-07 Operator Response to 2nd Round of Comments
2024-03 Supplemental Characterization Workplan response to comment
2024-03 Combined MMD and Agency Comments on 30% CCOP
2023-11 Ecological Risk Assessment
2023-11 Revegetation Plan
2023-11 Pit 1 Backill and Design Concept
2023-10 Pit 1 Radiological Surveys
2023-08 Pit 1 Highwall Stability – Phase 2 Report
2023-08 Cover Letter, UNC Response to Comments
2023-08 UNC Response to Comments on CCP
2023-05 MMD, Agency and Navajo Nation Comments
2022-11 Request for Tribal Comments
2022-11 Request for Agency Comments
2022-10 Updated Stage 2 Abatement Plan and Closure/Closeout Plan (CCP)
Stage 2 Abatement Plan Modification
Attachment B – OSE Well Restriction
Attachment C – INTERA Memo 2021
Attachment D – Stantec Memo 2021
Attachment E – Peer Review Dr. Smith
Attachment F – Closure/Closeout Plan
Closure/Closeout Plan Drawings
Appendix A.1 Vegetation and Wildlife Report
Appendix A.2 Cultural Resources Survey (Withheld/Confidential)
Appendix B.1 Materials Characterization Report
Appendix B.2 Supplemental Materials Characterization Report
Appendix B.3 Pit 1 Pile Investigation Report
Appendix C.1 Closeout EXC Plan
Appendix C.3 Closeout Plan SOP
Appendix D.1 2018 Geotechnical Investigation
Appendix F.1 – Flow Characterization
Appendix F.2 Hydraulic Design for Meyer Draw
Appendix F.3 Design of Bench and Downdrain
Appendix F.4 Design of Pit 1 Diversion Channel
Appendix G.1 Cover Design Calculations
Appendix G.2 Erosional Stability Calculations
Appendix H.1 Appendix A Materials Characterization
Appendix H.2 Updated Revegetation Plan
2021-07 Letter, Clarification of Agency Position
2021-05 Work Plan for Pit 1 Field Investigation
2020-02 Request for NMED Comments, Opinion of Construction Costs
2020-01 Opinion of Construction Costs, Updated Interim Financial Assurance
2019-09 MMD Comments on Updated Closeout Plan
2019-08 NMED Comments on Updated Closeout Plan
2019-04 Request for Agency Comments on Updated Closeout Plan
2019-03 2019 Updated Closeout Plan:
2018-09 Memo – Supplemental Materials Characterization, Sep 2018
2018-08 Memo – Geotechnical Investigation, Aug 2018
2018-06 Operator Response to Technical Comments
2018-04 Technical Comments on Workplan for Supplemental Investigations
2018-02 Workplan for Supplemental Investigations
2017-09 Final Order (Approval) – Petition for Alternative Abatement Standards
2016-01 Anticipated Schedule
2010-09 St. Anthony Interim Closure/Closeout Plan Cost Estimate
Attachment 1 Closeout Plan Drawings
Attachment 2 Hydrological Analysis
Conditional Hydrologic Analysis
Attachment 3 Cost Estimate Classification System
Attachment 4 Cost Estimate Spreadsheet
2007-10 Materials Characterization Report
Appendix A – Radiation Survey Field Forms
Appendix B – Laboratory Analytical Data (6MB)
Appendix C – Field Notes, Boring Logs, and Test Pit Logs (3MB)
2006-05 Report on Vegetation and Wildlife Evaluations/Recommendations