Programs & Services

Search EMNRD

Roca Honda Resources, LLC, Santa Fe, New Mexico
Uranium, McKinley County

03-2020 MMD Letter on Baseline Data Report Status 
02-2020 Report for Rio San Jose Characterization – 2019 Field Work
01-2020 Operator Responses, BDR Sept 2019 Revision 2 – Present and Historic Land Use
10-2019 Comment letter to Operator
09-2019 Operator Responses to Agency Comment on Addendum 2 to Baseline Data Report
05-2019 Comment letter to Operator
02-2019 Operator Responses to Agency Comments on Addendum 1 to Baseline Data Report
11-2018 Agency Comments on Addendum 1 to Baseline Data Report
08-2018 Request for Agency Comments on Addendum to Baseline Data Report
07-2018 Addendum to Baseline Data Report
09-2015 Report on Rio San Jose Characterization
04-2015 Workplan for Rio San Jose Characterization

08-2014 Southern Discharge Pipeline Proposal

Workplan 8-5-2014
NMED Comments 9-10-2014
RHR Responses 10-8-2014
NMED Comments 10-15-2014
RHR Responses 10-28-2014

03-2014 Revised Permit Application, March 2014

11-2013 RHR Cover Letter

RHR Responses to Agency Comments on Mine Operation Plan (Revised October 2013) and Baseline Data Report (Revised October 2013)

10-2013 Roca Honda Mine Operation Plan, Revised October 2013

Mine Operation Plan, Revised October 2013

10-2013 Roca Honda Baseline Data Report, Revised October 2013

Baseline Cover
Baseline Interior Cover
Baseline TOC Acronyms
Section 1: Introduction
Section 2: Climatology
Section 3: Topography
Section 4: Vegetation
Section 5: Wildlife
Section 6: Topsoil
Section 7: Geology
Section 8: Surface Water
Section 9: Groundwater
Section 10: Prior Mining
Section 11: Cultural Resources
Section 12: Land Use
Section 13: Radiation Survey

09-2013 Agency Comments to 05-2013 Mine Operation Plan and Baseline Data Report

05-2013 Roca Honda Mine Operation Plan, Revised May 2013

RHR Responses to Agency Comments
RHR Cover Letter
Mine Operation Plan, Revised May 2013

05-2013 Roca Honda Mine Baseline Data Report, Revised May 2013

RHR Responses to Agency Comments
RHR Cover Letter
Baseline Cover
Baseline Interior Cover
Baseline TOC Acronyms
Section 1: Introduction
Section 2: Climatology
Section 3: Topography
Section 4: Vegetation
Section 5: Wildlilfe
Section 6: Topsoil
Section 7: Geology
Section 8: Surface Water
Section 9: Groundwater
Section 10: Prior Mining
Section 11: Cultural Resources
Section 12: Land Use
Section 13: Radiation Survey

03-2013 Roca Honda Reclamation Plan Revision 1

RHR Responses to Agency Comments
RHR Cover Letter
Reclamation Plan Revision 1 (23 Mb)
Post Mine Radiological Surveys

10-2012 Roca Honda Mine Baseline Data Report REV1

RHR Responses to Agency Comments
RHR Cover Letter
Baseline Cover
Baseline Interior Cover
Baseline TOC Acronyms
Section 1: Introduction
Section 2: Climatology
Section 3: Topography
Section 4: Vegetation
Section 5: Wildlife
Section 6: Topsoil
Section 7: Geology
Section 8: Surface Water
Section 9: Groundwater
Section 10: Prior Mining
Section 11: Cultural Properties
Section 12: Land Use
Section 13: Radiological Survey

10-2012 Agency Comments to 05-2012 Reclamation Plan

09-2012 Roca Honda Mine Operations Plan REV1

Cover Letter
RHR Mine Operations Plan – Rev 1 with Replacement Pages
Attachment 1: Selected Construction Drawings
Responses to Agency Comments

08-2012 Cover Letter

Assessment of Potential Groundwater Level Changes from Dewatering at the Proposed Roca Honda Mine
Appendix A
Appendix B
Appendix C
Appendix D
Appendix E
Roca Honda Resources Responses

06-2012 Cover Letter

Biological Survey of Reuse Pipeline Route

05-2012 Roca Honda Reclamation Plan, Cover Letter, May 2012

Roca Honda Response to Agency Comments on Reclamation Plan
Roca Honda Reclamation Plan, Revision 1, with May 2012 replacement pages

03-2012 Assessment of Potential Groundwater Level Changes from Dewatering at the Proposed Roca Honda Mine

Cover Letter
Addendum: Assessment of Potential Groundwater Level Changes from Dewatering at the Proposed Roca Honda Mine

Revised Report (dated March 8, 2012)

Sections 1, 2, and 3

Section 1: Introduction
Section 2: Hydrogeology
Section 3: Construction of the Numerical Model

Section 4, 5, 6, and 7

Section 4: Calibration of the Historical Numerical Model
Section 5: Roca Honda Mine Dewatering Impact Assessment
Section 6: Summary and Conclusions
Section 7: References

Appendix A: Boundary Conditions by Model Layer
Appendix B: Hydraulic Conductivity Zones by Model Layer
Appendix C: Transient Calibration Plots
Appendix D: Potential Changes in Groundwater Levels at Wells with Water Supply Uses

01-2012 Mine Operations Plan, Revision 1 (75 Mb)

Mine Operations Plan, Attachment 1-Construction Drawings (90 Mb)
Cover Letter from Roca Honda Resources
Roca Honda Resources Response to Comments on Mine Operations Plan

11-2011 Assessment of Potential Groundwater Level Changes from Dewatering at the Roca Honda Mine, McKinley County, New Mexico (Intera, November 2011)

Sections 1, 2 and 3 (7 Mb)

Section 1: Introduction
Section 2: Hydrogeology
Section 3: Construction of the Numerical Model

Sections 4, 5, 6 and 7 (4 Mb)

Section 4: Calibration of the Historical Numerical Model
Section 5: Roca Honda Mine Dewatering Impact Assessment
Section 6: Summary and Conclusions
Section 7: References

Appendix A: Boundary Conditions by Model Layer (1.5 Mb)
Appendix B: Hydraulic Conductivity Zones by Model Layer (3 Mb)
Appendix C: Transient Calibration Plots
Appendix D: Potential Changes in Groundwater Levels at Wells with Water Supply Uses

08-2011 RHR Reponses to MMD Comments on Reclamation Plan
08-2011 Reclamation Plan for Roca Honda Mine
01-2011 Roca Honda Resources Response to Agency Review Comments
01-2011 Roca Honda Baseline Data Report Revision 1

Cover
Interior Cover
Table of Contents and Acronyms
Section 1 Introduction
Section 2 Climatology
Section 3 Topography
Section 4 Vegetation
Section 5 Wildlife
Section 6 Topsoil
Section 7 Geology
Section 8 Surface Water
Section 9 Groundwater
Section 10 Prior Mining
Section 11 Cultural Properties
Section 12 Land Use
Section 13 Radiological Survey

01-2011 Roca Honda Mine Water Treatment Plant Plant 60% Design

Appendix A Drawings
Appendix B Construction Quotations
Appendix C Operating Costs
Appendix D Equipment Sizing
Appendix E Capital and Construction Costs
Appendix F Design Criteria and Procedures

12-06-2010 Public Notice, U.S. Forest Service Open House, Roca Honda Mine

11-24-2010 Mining and Minerals Division Review Comments and Request for Additional Information, Mine Operations Plan and Reclamation Plan

09-23-2010 Agency Review Comments and Request for Additional Information, Revised Sampling and Analysis Plan
09-03-2010 Agency Review Comments and Request for Additional Information, Baseline Data Report

04-2010 Agency Comments to Roca Honda New Mine Permit Application

New Mexico Department of Game and Fish

02-2010 Agency Comments to Roca Honda New Mine Permit Application

New Mexico Department of Cultural Affairs
New Mexico Environment Department
Office of the State Engineer

12-15-2010 Mining and Minerals Division Request for Agency Review and Comment on the Roca Honda New Mine Permit Application
12-02-2009 Roca Honda Resources Response to Permit Application Administratively Complete Determination
11-25-2009 Mining and Minerals Division Roca Honda New Mine Permit Application Administratively Complete Determination

11-20-2009 Permit Application, Phase II of a New Mine Application

Permit Application for a New Mine

Baseline Data Report

Section 0: Table of Contents
Section 1: Introduction
Section 2: Climatology & Air Quality
Section 3: Topography
Section 4: Vegetation
Section 5: Wildlife
Section 6: Topsoil
Section 7: Geology
Section 8: Surface Water
Section 9: Ground Water
Section 10: Prior Mining Operations
Section 11: Historic Places & Cultural Properties
Section 12: Present Historic Land Use

Mine Operations Plan
U.S. Forest Service Plan of Operation
Reclamation Plan

12-2009 Agency Comments to Roca Honda Revised Sampling and Analysis Plan

U.S. Forest Service Consolidated Response

11-2009 Agency Comments to Roca Honda Revised Sampling and Analysis Plan

New Mexico Department of Game and Fish
Office of the State Engineer

11-20-2009 Sampling and Analysis Plan Revision, Phase I of New Mine Application

Sampling and Analysis Plan Application

Section 1: Introduction
Section 2: Meteorology and Air Quality
Section 3: Topography
Section 4: Vegetation
Section 5: Wildlife
Section 6: Topsoil
Section 7: Geology
Section 8: Surface Water
Section 9: Ground Water
Section 10: Radiological Survey
Section 11: Historical Places and Cultural Properties
Section 12: Present and Historic Land Use
Section 13: Prior Mining Operations
Plate 1: Regional Ground Water Wells
Plate 1: Supporting Table
Attachment 1: Field Quality Assurance Plan
Attachment 2: Access Agreement

11-17-2009 Multicultural Alliance for a Safe Environment (MASE) Request for Public Hearing on the Roca Honda New Mine Permit Application
10-16-2009 Roca Honda Resources Response to Sampling and Analysis Plan Agency Comments

09-2009 Agency Comments to Roca Honda Sampling and Analysis Plan

New Mexico Environment Department

07-15-2009 Agency Comments to Roca Honda Sampling and Analysis Plan

No. 1: Mining & Minerals Division 07-10-09
No. 2: Department of Cultural Affairs 05-26-09
No. 3: Department of Game & Fish 05-21-09
No. 4: New Mexico Environment Department 05-29-09
No. 5a: Office of State Engineer Cover 05-29-09
No. 5b: Office of State Engineer 05-29-09
No. 5c: Office of State Engineer 05-21-09
No. 6: State Forestry Division 05-26-09
No. 7: Compilation of Agency Review Comments

05-09-2009 Sampling and Analysis Plan Revision, Phase I of New Mine Application

Section 3: Topography
Section 13: Prior Mining Operations

04-24-2009 State Solicits Public Comment on Sampling and Analysis Plan for Proposed Roca Honda Uranium Mining Operation

04-15-2009 Sampling and Analysis Plan, Phase I of New Mine Application

Transmittal Letter
Roca Honda Resources Certification
Sampling Plan Application
Section 1: Introduction
Section 2: Meteorology and Air Quality
Section 3: Topography
Section 4: Vegetation
Section 5: Wildlife
Section 6: Topsoil
Section 7: Geology
Section 8: Surface Water
Section 9: Ground Water
Section 10: Radiological Survey
Section 11: Historical Places and Cultural Properties
Section 12: Present and Historic Land Use
Plate 1: Regional Ground Water Wells
Field Quality Assurance Plan

01-05-2009 Mining and Minerals Division Roca Honda New Mine Permit Sampling and Analysis Plan Application Administratively Incomplete Determination